Isolation plans and job plans in hours, not days.

Isolation plans, turnaround readiness, job plans, and inspection history all come down to someone gathering the drawings, procedures, records, and parts for each job. Raven's agents do the gathering: P&IDs, isolation procedures, OEM manuals, work-order history, inspection reports. The plans and checklists come back drawn on the P&ID, with every source attached.

Isolation planning

Isolation plans, drawn on the P&ID.

Control-of-work and isolation management systems route the permits; tracing the isolation itself across the drawings is still manual. Raven's agents trace the line on the P&ID and draft the plan with the procedure and prior isolations attached, for your shift in-charge to check and authorize.

Raven — Isolation planning
run complete
You hand it
“Draft the isolation plan for the P-101A seal change”
Raven runs
P&ID 1103SOP-118+3 prior isolations
tracing the line and its energy sources on the P&ID
marking the isolation points, vents, and drains
attaching the procedure and prior isolations
P-101AV-118V-121
Export .xlsx
Back to you
a draft plan for your shift in-charge to check and authorize
Turnaround readiness

Shutdown & turnaround readiness.

Turnaround overruns are mostly data failures found mid-shutdown: scope that doesn't match the field, spares not kitted, drawings superseded since the scope was written. Raven's agents check the worklist before mobilization: every job against its drawings, procedures, and prior records, every spare against stock and open orders.

Raven — Turnaround readiness
run complete
You hand it
“Check the U-300 turnaround worklist before mobilization”
Raven runs
worklist · 212 jobsP&IDs · U-300stock extract
checking each job's drawings, procedure, and blind list
matching required spares and gaskets against stock and open orders
flagging scope written against superseded drawings
JobCheckFinding
WO-6642 · E-210 bundle pullspares · recordskitted · 2021 pull linked
WO-6621 · P-101A overhaulsparesgasket set 24″ · no stock
WO-6633 · line 1103 tie-indrawingsscope cites Rev 6 · Rev 7 issued
WO-6650 · V-201 internalprocedure · blindsattached · blind list drawn
Export .xlsx
Back to you
the gap list, weeks before the shutdown, for the turnaround planner
Job plans

Job plans from the manuals.

Most job plans in the CMMS are copied forward or written from memory. Raven's agents draft the task list from the OEM manual and the equipment's own work-order history, each step with the page it came from, for the planner to finish.

Raven — Job plans
run complete
You hand it
“Build the job plan for the P-101A overhaul”
Raven runs
IOM-3101DS-4411+7 work orders
reading the OEM manual and datasheet
pulling the equipment's work-order history
drafting the tasks and the parts list
1

Decouple, lock out, drain

2

Pull rotating element

3

Inspect wear rings & seal

4

Reassemble & align · 0.05 mm

Export .xlsx
Back to you
a draft plan for the planner to finish
Inspection & integrity

Inspection history per equipment.

Inspection data systems hold the surveys; connecting them to the equipment is still manual. Raven's agents attach thickness readings, repairs, and past reports to each equipment and circuit, trended against minimum thickness, ready before the FFS or the internal inspection.

Raven — Inspection & integrity
run complete
You hand it
“Pull E-210's inspection history before the FFS”
Raven runs
UT surveys · 3repairs · 2+past reports
gathering the UT surveys, repairs, and past reports
attaching each record to the equipment and its circuits
trending thickness against minimum thickness
E-210 · shell course 2 · thickness, mmt-min201920222025
Export .xlsx
Back to you
a history file for the inspection engineer
After the first job

Reliability and integrity work, on the same model.

Work orders per equipment

Work orders and failure history attached to the corrected hierarchy, so the record follows the equipment.

Bad actors across units

The equipment that fails most, identified across units from the work-order history.

FMEA and root-cause reviews

Reviews prepared with the equipment's drawings, datasheets, and history in one place.

Incidents linked to equipment

Incidents and near-misses linked to the equipment involved, visible from the drawing.

Damage mechanisms per circuit

Damage-mechanism reviews consolidated on the drawing: mechanisms, corrodents, and operating limits per circuit, so inspection effort goes where the risk is.

Corrosion trends and remaining life

Thickness records attached to each equipment and circuit, with corrosion trends and remaining-life flags.

PSV register with due dates

The relief valve register with test and calibration due dates, linked to each valve's datasheet and relief drawing.

Safety-critical equipment register

Built from the P&IDs and datasheets, with each item's supporting documents in one place.

Blind lists for the turnaround

Prepared from the P&ID and checked against the isolation plans before the shutdown.

Getting started

How a job starts here.

Most maintenance teams start with one unit. Raven converts its P&IDs into smart drawings, links the procedures, work orders, and inspection records to the equipment, and runs one job start to finish: an isolation plan, a readiness check, or a job plan on your own equipment. Before a turnaround, the same start works on the worklist: send the scope and the drawings, and the gaps come back before mobilization.

From there we agree the scope: we do the jobs for you, or your team runs them in Raven. Your engineers approve the result either way.

What to send: One unit's P&IDs as PDF scans. Nothing else to start.

See Raven on your plant

A demo walks you through the jobs on this page, on your own drawings. Or send one unit's P&IDs: the unit comes back as a smart drawing, with the procedures, history, and spares connected to it.