Skip to main content
Solutions/Materials & Procurement

Find the money sitting in your material data.

Material master cleansing, cataloguing, and BOM work all come down to someone reading the vendor documents. Raven's agents do the reading: spare parts lists, IOM manuals, GA drawings, datasheets. Your material master, BOMs, and inventory are checked against what the documents say, and every value links to the page it came from.

Raven is not another EAM, and nothing migrates. It works from extracts of the SAP, Maximo, or other EAM you already run, and the corrections go back into it.

Duplicate & obsolete codes

Duplicate and obsolete codes, valued.

This is the de-duplication and obsolescence review of a material master cleansing project, done by agents that read the documents. Candidates come with the evidence attached, your materials team confirms, and every confirmed pair is valued at the stock held against it.

Raven — Duplicate & obsolete codes
run complete
You hand it
“Find the duplicate codes across our four sites and value them”
Raven runs
register extractstock · 4 sites
breaking each description into its parts
matching maker part numbers and specs across codes
pulling the stock and value held under each pair
CodeDescriptionOn handFinding
MS-118402SEAL, MECHANICAL; 45MM2 · site Aduplicate pair
MS-104226MECH SEAL 45 MM T-211 · site Csame maker part no.
GSK-2205Gasket, spiral wound 6″40superseded · still stocked
BRG-30291Bearing 6207-2Z12no movement · 6 yrs
Export .xlsx
Back to you
candidate pairs to your materials team; confirmed ones valued
Spares before the job

Spares checked before the job.

Before each PM job, the parts its task list needs are checked against stock and open orders. Stockouts reach the planner with time to order or borrow, not on the morning of the job.

Raven — Spares before the job
run complete
You hand it
“Check spares for next month's U-300 PM jobs”
Raven runs
PM schedule · 14 jobsstock extract
reading the task lists for next month's jobs
matching each part through the equipment BOMs
checking stock and open purchase orders
PartJobStock
Seal kitPM-1142 · P-3101A2 in stock
Wear ring setPM-1142on order · PO-8812
Coupling insertPM-1156 · K-401no stock
V-belt setPM-1160 · B-2056 in stock
Export .xlsx
Back to you
stockouts flagged to the planner, in advance
Purchase price variance

The same part, bought at three prices.

Procurement leakage hides in the purchase history: the same part bought under different codes and descriptions, from different vendors and sites, at different prices. Raven's agents match last year's PO lines through the cleaned catalogue and list each part's buys side by side, with the POs attached.

Raven — Purchase price variance
run complete
You hand it
“Check last year's POs for the same part at different prices”
Raven runs
PO extract · 12 moregister extract
matching each PO line to its material code and maker part number
grouping buys of the same part across codes, vendors, and sites
listing the price spread with the POs behind it
PartPOsPrices
Gasket, spiral wound 6″PO-8812 · PO-9107 · PO-93119.80 → 21.50 · 2.2× spread
Mech seal 45 mm T-21PO-8790 · PO-9040consistent
Brg 6207-2Z4 POs · 3 vendorsone vendor 1.6× high
Export .xlsx
Back to you
the spread with the POs attached, for your procurement lead
After the first job

Inventory, purchasing, and stores work, on the same model.

Min/max from real consumption

Reorder levels checked against actual consumption and lead-time history; out-of-line values flagged for your planner.

Critical equipment with no spares

Critical equipment holding no spares in stock flagged, and over-stocked non-critical spares alongside.

Where-used across equipment

Every material code shows the equipment it is used on, so interchangeable spares show up and stock levels can be set on shared usage.

PRs checked before they are raised

New purchase requests checked against the BOM specification, so the wrong part is caught before the order goes out.

Warranty claims from the records

Repairs done at cost on equipment still under warranty, flagged from the purchase and repair records with the claim evidence attached.

Last-time-buy alerts

Parts the OEM has discontinued, flagged from supersession records while a last order can still be placed.

Photo to material code

A photo of a part or its nameplate matched to its material code and datasheet, for unlabelled parts in stores or worn parts in the field.

Shelf life and preservation

Shelf-life items nearing expiry flagged, along with missed preservation on stored spares.

Non-moving and surplus stock

Non-moving and surplus stock identified, with disposal candidates.

One catalogue across sites

The same part under one code, with stock visible across plants. An emergency spare can come from a sister plant instead of a long OEM lead time.

SPIR processed at handover

SPIR and project spares documentation processed at handover, so new equipment enters the EAM clean.

Getting started

How a job starts here.

Most plants start with a data quality check. Send a material master export from SAP or Maximo, the stock reports, and a folder of vendor documents. Raven runs the checks and returns one report of everything they find: missing attributes, unit mismatches, duplicate candidates, and equipment with no BOM, with counts and values.

It shows how big the cleanup is and how much money is stuck in it. From there we agree the scope: we do the job for you, or your team does it themselves in Raven. Your engineers approve the result either way.

What to send: Material master export from SAP MM or Maximo (Excel or CSV, all plants), stock on hand by plant, and if you have it, a folder of vendor spare-parts lists or IOM manuals. One plant is enough.

See Raven on your plant

A demo walks you through the jobs on this page, on your own data. Or start with the data quality check: send a material master export and see what the checks find.