Skip to main content
Solutions/Process Safety

HAZOPs, investigations, and audits that start prepared.

An audit means weeks of assembling evidence that should already agree, and the most common finding is an action item nobody closed. Raven's agents keep the evidence connected in the asset information model: MOCs checked against the drawings they should have reached, recommendations tracked to closure, safeguards linked to their basis and test records. Anything unresolved reaches your engineers as a flagged exception.

Incident & RCA evidence

Investigations that start from evidence.

Incident systems hold the reports; assembling what actually happened is still manual. Raven's agents pull the alarms, permits, work orders, and prior occurrences around a failure into one timeline, so the investigation starts from evidence. Conclusions stay with your team. Reporting, investigation, and CAPA tracking themselves are Raven Incident, a standalone product for HSE teams.

Raven — Incident & RCA evidence
run complete
You hand it
“Assemble the evidence on Tuesday's K-401 trip”
Raven runs
alarm loghistorianWO history
pulling the alarm and historian records around the trip
linking permits, work orders, and prior occurrences on the machine
laying the sequence out as a timeline
21:02

discharge temperature rising on K-401

21:14

trip on TAH-4012

21:20

permit active on the adjacent line

2024

similar trip, same machine, seal failure

Export .xlsx
Back to you
a timeline for the investigation team; conclusions stay with them
Recommendations to closure

Every recommendation tracked to closure.

The most common audit finding there is: a recommendation nobody closed. Raven's agents read the registers from studies, PHAs, and investigations, link the closure evidence behind each item, and surface the open ones with owners before the audit finds them.

Raven — Recommendations to closure
run complete
You hand it
“Which HAZOP recommendations on U-300 are still open?”
Raven runs
recommendation registersclosure records
reading the registers from studies, PHAs, and investigations
linking the evidence behind each closed item
listing the open ones with owners and ages
RecommendationFromStatus
Remote isolation on P-101AHAZOP 2023closed · evidence linked
Revalidate V-201 relief sizingaudit 2024open · 14 months
Update SOP-118 after rerouteMOC-2231no closure evidence
Guard on E-210 platformnear-missclosed
Export .xlsx
Back to you
the open items with owners, for the PSM lead
Mechanical integrity

Every inspection interval, due date, and deficiency, visible.

Mechanical integrity is the most-cited PSM element in audits, and its evidence sits across the EAM, the inspection reports, and the datasheets. Raven's agents build the register: every item with its interval, last and next date, acceptance criteria, and deficiency status. Overdue items, deficiencies without a disposition, and relief valves sitting in no maintenance plan are flagged.

Raven — Mechanical integrity
run complete
You hand it
“Build the mechanical integrity register for U-300”
Raven runs
EAM extractinspection reportsdatasheets
reading intervals, dates, and criteria from the records
matching each item's last report against its acceptance criteria
flagging overdue items and deficiencies without a disposition
ItemNext dueStatus
E-210 · vessel internal2027-03on schedule
PSV-201 · relief test2026-01overdue · 7 months
V-201 · shell UT2026-11deficiency · no disposition
PSV-108 · reliefin no maintenance plan
Line 1103-2 · circuit2028-02on schedule
Export .xlsx
Back to you
the register with the flags, for the inspection and PSM leads
HAZOP preparation

HAZOPs that start prepared.

PHA software tracks the studies; assembling each node's file is still manual. Raven's agents pull the node's drawings, safeguards, operating limits, prior incidents, and open changes into a pre-read, so the workshop spends its time on the hazards, not the paperwork.

Raven — HAZOP preparation
run complete
You hand it
“Prepare node 4 for next week's HAZOP”
Raven runs
P&ID 1103C&E · sheet 4incident records
assembling the node's drawings, safeguards, and operating limits
linking prior incidents and open changes on the node
drafting the pre-read for the chair
ItemState
P&IDs + interlock C&Eattached
Operating limits & safeguardslisted
Prior incidents on this node2 linked
Open changes on the nodeMOC-2231 still open
Export .xlsx
Back to you
a pre-read for the chair; the workshop stays with your team
PSSR & MOC closeout

MOC and PSSR closeout, checked against every document the change should have reached.

MOC software routes the approvals; checking that each change actually reached the documents is still manual. Raven's agents check every MOC against the P&IDs, procedures, and records it should have updated, and verify the PSSR checklist before the unit comes back.

Raven — PSSR & MOC closeout
run complete
You hand it
“Check U-300's PSSR items against the records”
Raven runs
MOC registerPSSR checklistP&ID revisions
verifying each MOC closed and its drawings issued
checking procedures against the changes
flagging temporary changes past their end date
ItemStatus
MOC-2231 · closed outverified
P&ID 1103 · Rev 7 issuedverified
SOP-118 · revisionoutstanding
TMP-114 · temporary changepast its end date
Export .xlsx
Back to you
open items to the PSSR chair
Safeguard & barrier register

The safeguard register, built from the drawings.

Audit and barrier management programmes need one register of the safeguards; building it from the drawings is the manual part. Raven's agents read the relief valves, interlocks, and trips off the P&IDs and cause-and-effect matrices, link each one's sizing basis and test record, and flag the gaps before the audit asks.

Raven — Safeguard & barrier register
run complete
You hand it
“Build the safeguard register for U-300”
Raven runs
P&IDs · U-300C&E matricestest records
reading the PSVs, interlocks, and trips off the drawings
linking each one's sizing basis and test record
flagging items with no basis or no test
SafeguardBasisTest record
PSV-201 · reliefsizing linkedtest 2025
FIC-1102 · interlockC&E · sheet 4in register
TAH-4012 · high tripon the drawingno test record
Export .xlsx
Back to you
a register with the gaps flagged, for the PSM lead
After the first job

Audit readiness, on the same model.

Inspection due dates watched

The mechanical integrity register's next-due dates tracked as they age; overdue items flagged without waiting for the audit.

Deficiencies to disposition

Failed acceptance criteria without a disposition, and deficiencies without closure evidence, surfaced per item.

MOC propagation checks

Every change checked against the P&IDs, datasheets, procedures, and records it should have reached.

Procedure certification dates

SOP revision and annual-certification dates watched; operating limits and consequence-of-deviation present.

PHA revalidation clock

Each unit's study age against the five-year revalidation clock, with its recommendation register beside it.

Relief design basis per item

A sizing basis present for every pressure-containing item, from the datasheets and the flare study.

PSI currency after each change

P&IDs, datasheets, and studies re-checked for currency when a change closes.

Findings kept as one register

Every finding kept with its source, criterion, owner, and closure evidence.

Temporary changes watched

Temporary changes flagged when they pass their end date, not found at the audit.

Getting started

How a job starts here.

Most process-safety teams start with one unit and one element. Send the MOC register, the recommendation registers, and the drawings; Raven runs the checks and returns the findings: changes that never reached their documents, recommendations without closure evidence, safeguards without a test record. The same checks are what a regulator visit, an insurer's risk-engineering survey, or a post-incident review asks for.

Your auditor still audits, and your engineers still decide. They start from evidence that is already assembled and cited, not from a document hunt.

What to send: One closed MOC package and the P&IDs, procedures, and datasheets it should have reached.

See Raven on your plant

A demo walks you through the jobs on this page, on your own records. Or send one closed MOC with its drawings: we show you whether the change reached every document it should have.