Every change and every permit, checked against the drawings.

MOC software routes the approvals and the permit system moves the forms, but the checking behind them is still manual: an engineer walking the drawings to map what a change touches, a sample of permits audited because nobody can read them all. Raven's agents read the drawings and records themselves: every change mapped before the review, every permit checked, every design question answered with the page it came from.

MOC impact review

Everything a change touches, mapped before the review.

MOC software routes the change for approval; the impact assessment behind it is still an engineer walking the drawings. Raven's agents follow the change across the P&IDs and list every line, instrument, procedure, and datasheet it touches, with prior changes on the same system beside them. The review starts complete.

Raven — MOC impact review
run complete
You hand it
“Map everything the line 1103-2 reroute touches”
Raven runs
P&IDs · U-300interlock C&EMOC register
following the rerouted line across the P&IDs
pulling the interlocks, procedures, and datasheets on it
listing prior changes on the same system
FIC1102P&ID 1103 · proposed reroute (dashed)
TouchedFound inNote
FIC-1102 · control loopP&ID 1103on the new routing
Interlock I-12 · trips P-101AC&E · sheet 4in the worksheet
SOP-118 · normal lineupprocedurecites the old routing
PSV-201 · relief sizingDS-0412basis affected
MOC-1984 · 2023 · same headerMOC registerprior change linked
Export .xlsx
Back to you
an impact worksheet for the MOC reviewer
Permit & isolation checks

Every permit checked, not just a sample.

Control-of-work systems raise and route the permits; checking each one against the drawings is still manual, so audits sample. Raven's agents check every permit: the isolation list against the P&ID, the draft against your permit standard, the overlaps against other permits active in the same area.

Raven — Permit & isolation checks
run complete
You hand it
“Check tomorrow's permits against the drawings”
Raven runs
permit registerP&IDs · U-300site standard
checking each permit's isolation list against the P&ID
comparing the drafts against the site permit standard
flagging overlaps with permits active in the same area
PermitCheckFinding
PTW-3321 · hot workisolationsblind at N2 tie-in not on the list
PTW-3324 · line breakSIMOPSoverlaps PTW-3321 · Rack 4
PTW-3318 · vessel entryisolations · gas testcomplete
PTW-3299 · closedreinstatementde-isolation verified
Export .xlsx
Back to you
findings to the shift in-charge; they authorize
SOPs, logbooks & bypass records

What's bypassed right now, and who approved it?

Shift logbooks and bypass registers record what happened; finding it again is the manual part. Raven's agents keep every procedure, log entry, and bypass record linked to the equipment on the drawing, and draft procedure updates from your own documents, each step cited to the SOP, P&ID, or manual it came from.

Raven — SOPs, logbooks & bypass records
run complete
You hand it
“List the open bypasses and overrides on U-300”
Raven runs
bypass registershift logbookinterlock C&E
reading the bypass register and the shift log entries
linking each bypass to its interlock and approval record
flagging the ones past their review date
BypassRecordStatus
BP-118 · interlock I-12log · 12 Mayopen · past review date
BP-121 · TAH-4012 overrideapproval linkedreview due 04 Sep
BP-097 · analyser A-204reinstatedclosed
Export .xlsx
Back to you
the open items, for the shift in-charge's handover
Troubleshooting context

The case file assembled while the unit is still running wrong.

When a loop hunts or a machine trips, the diagnosis starts with a document hunt: the design basis, what changed recently, whether it has happened before. Raven's agents assemble that case file while the deviation is live: design values and operating limits, past occurrences and how they closed, the changes made on the loop recently.

Raven — Troubleshooting context
run complete
You hand it
“Pull everything relevant to FIC-1102 hunting at low load”
Raven runs
datasheetsshift logsWO history
pulling the design basis and operating range for the loop
searching past occurrences and how they closed
listing recent changes on the loop
ContextRecord
Design range · 40–220 m³/hDS-0311 · p.2
Same behavior · Mar 2024WO-8841 · positioner replaced
Upstream reroute · 2 weeks agorecent change · MOC-2231
Operating limit · min 45 m³/hoperating manual §4
Export .xlsx
Back to you
a case file for the process engineer
Design-data lookups

Design values with the page they came from.

Half the questions that reach technical services are answered in a document somebody has to find: a design pressure, a trip setting, a spec clause. Raven's agents search the datasheets, design manuals, and specs and return the value with its page, so the answer takes minutes and can be checked.

Raven — Design-data lookups
run complete
You hand it
“Get the design pressure of V-201 with the source”
Raven runs
datasheetsdesign manualsMOC register
searching V-201's datasheets and design manuals
pulling the value with the page it came from
checking for changes since the datasheet was issued
ItemValuePage
Design pressure12.1 bargDS-0207 · p.2
Hydrotest18.2 bargDS-0207 · p.3
Relief line change · 2023see MOC-1984
Export .xlsx
Back to you
the answer with its page, in minutes
After the first job

Shift operations and technical services, on the same model.

Permit history per equipment

Every permit raised on an equipment attached to it, one click from the drawing.

Shift handover context

What changed on shift: permits, bypasses, and log entries per unit, assembled for the handover.

Bypasses watched

Open bypasses and overrides flagged as they pass their review date, not found at handover.

Procedures that stay current

SOPs re-checked when a change closes; steps citing a superseded drawing flagged.

Cause and effect, one click away

What trips what, read from the C&E matrices and linked to each loop on the drawing.

Resolved cases kept

Every troubleshooting case file kept with its fix, findable the next time the symptom appears.

Getting started

How a job starts here.

Most operations teams start with one unit and one week of permits. Send the closed permits with the unit's P&IDs; Raven checks every one and returns the findings: isolations missing from the list, overlapping work in the same area, reinstatements never verified.

Raven checks and flags. Your shift in-charge still authorizes every permit, and your engineers still decide what changes.

What to send: One week of closed permits from one unit, plus that unit's P&IDs.

See Raven on your plant

A demo walks you through the jobs on this page, on your own drawings and permits. Or send one week's closed permits with the unit's P&IDs: we check every one and show you what a full audit would have found.