Get straight to the history behind a problem.
Bring design limits, failures and recent changes into one case file. Find previous cases and their recorded fixes when a symptom returns.

Raven brings together equipment history, procedures and drawings to help troubleshoot problems and check changes before work begins.
Work MOC impact reviewLine 1103-2 connects the pump, control loop and relief system.
When an operating problem returns, bring the previous failures, design limits and recorded fixes into the same view.
Find affected procedures, missed isolation references and overlapping work while the change or permit is still being prepared.
Bring design limits, failures and recent changes into one case file. Find previous cases and their recorded fixes when a symptom returns.
Assemble permits, log entries and open bypasses for the handover. Flag bypasses and overrides past their review date.
Find design pressures, trip settings and specification clauses with their sources. Follow cause-and-effect links from each control loop.
Trace a proposed change across drawings, interlocks and procedures. Get the affected items together before the MOC review.
Check isolation lists, permit requirements and overlapping work. Keep previous permits linked to the equipment.
Re-check SOPs when an MOC closes. Flag steps that still refer to superseded drawings.
With operating data connected, Raven could help explain why a problem keeps returning, compare possible responses and follow what happens next.
A scenario to explore with your team.
Bring the event alongside earlier trips and recent operating changes.
Use process trends and equipment limits to guide the diagnosis.
Evaluate options with a validated process model and the operations team.
Check whether the intervention improves operation over time.