Skip to main content
An engineer checking a technical drawing
Solutions/Projects & Engineering

Clear the technical work holding up procurement.

Raven compares bids, prepares technical questions and checks document revisions so your engineers can resolve differences before purchase.

RavenWork Technical bid evaluation
Pump specificationRequisition · Rev 2

P-101A · purchaser requirements

ParameterRequiredReference
Rated head82 m§4.2
CasingSS316§5.1
NPSH margin1.0 m§4.4
Reading and checking the source filesYour engineers make the technical evaluation.
Where Raven helps

More time for engineering decisions.

Let Raven assemble the vendor comparison and technical questions so engineers can spend their time resolving the differences.

Catch disagreements before they become rework.

Compare requirements, vendor revisions and shared design values before equipment is purchased or documents are issued.

The work Raven takes on

Bid evaluations and vendor decisions

Technical bid evaluation

Get to the deviations sooner.

Compare every offer with the specification. Get the bid tabulation, deviations and technical questions ready for review.

Tested on a real pump bid evaluation with an international EPC.

Explore technical bid evaluation
Vendor datasheet comparison

Catch differences in vendor revisions.

Check each vendor revision against the requisition and process data. See changed values beside the requirements.

Technical queries & concessions

Keep vendor answers tied to the requirement.

Link each query to its clause, answer and closing revision. Assemble concession requests with the supporting document pages.

Design consistency and handover

Deliverable consistency

Catch disagreements before issue.

Check shared values across PFDs, P&IDs, line lists and datasheets. When the design basis changes, flag documents still citing the old values.

Datasheet preparation

Fill your templates from the design data.

Draft datasheets from the design basis, HMB and line list. Missing inputs are listed for the engineer.

Vendor documents & handover

Find missing documents before handover.

Check vendor submissions against the required document list. Flag missing revisions and inconsistencies before the owner receives them.

Looking ahead

See what a design change means for delivery.

With design, purchasing and project schedules connected, Raven could trace a technical change through the work it affects and help the team assess its options.

A scenario to explore with your team.

  1. The design basis changes

    Identify the equipment and vendor submissions affected by the new requirement.

  2. Trace the delivery impact

    Follow the change into purchase orders, lead times and project milestones.

  3. Compare the options

    Assess technical, cost and schedule consequences with the project team.

  4. Follow the agreed change

    Track revised documents, vendor commitments and delivery dates together.

See Raven on your plant