Skip to main content
Technical bid evaluation

Complete technical bid evaluations in hours.

Raven compares vendor offers with your specification and prepares the evaluation, deviations and technical questions.

An engineer comparing a component with an equipment cross-section drawing
The problem

Every offer needs checking against the same requirements.

Vendors organize their offers differently. A requirement may be answered in a datasheet, qualified in a note or left unanswered. Building the comparison means finding those responses and checking them against the purchaser’s specification.

  • Different formats make offers difficult to compare
  • Deviations and missing answers need technical questions
  • Revised offers need checking against the earlier findings
The solution

One comparison, from the requirement to the vendor’s answer.

Raven aligns the offers with the specification, identifies deviations and omissions, and prepares the technical questions. Select a requirement below to compare the source documents and see the technical question it produces.

Technical bid evaluation · Illustrative example

Seal plan: Plan 52 offered against Plan 53B.

MR-P101 · Rev 3

P-101A · purchaser specification

Pump requirements
ParameterRequired
Rated flow220 m³/h
Seal planPlan 53B
Wetted partsSS316
Offer B · Rev 0

Vendor B · technical offer

Seal support system
Seal planPlan 52

Offered: Plan 52 · Required: Plan 53B

Raven’s finding

Technical question · Seal plan

Confirm compliance with Plan 53B, or explain the proposed deviation.

Piloted on a pump case with an international EPC.The evaluation covered the purchaser requirements and multiple vendor offers.

How it works

  1. 01

    Read the requirements and offers

    Start with the purchaser specification, datasheets and vendor offers as received. Raven extracts the requirements and finds each vendor’s response, including qualifications and exclusions.

  2. 02

    Build the evaluation and technical questions

    Align the responses requirement by requirement. Record deviations and omissions, link the supporting pages and prepare the questions needed to resolve them.

  3. 03

    Return the comparison for engineering review

    Receive the evaluation, technical questions and open decisions in the format your team uses. Each finding links to its specification clause and vendor page. Your engineer makes the final technical decision.

Value for your team.

Less time assembling the evaluation.

Start with the requirements, vendor responses and open questions together instead of building the comparison row by row.

A clearer basis for the engineering decision.

See where an offer differs, what remains unanswered and which source supports each finding.

Check a revised offer

Keep vendor revisions in the same case and check the new response against the open questions.

Evaluate the next equipment purchase

Apply the same requirements-to-response comparison to the next set of specifications and offers.

Extend across the project

Have Raven prepare further evaluations, or let your team run the work in Raven as bids arrive.

Explore Raven Work

See what a completed evaluation contains.

Walk through the vendor comparison, deviations and technical questions from a real TBE case. Then start with one equipment purchase your team is evaluating.

See a completed evaluation