WO-1061 · vessel inspection
| Required part | Quantity |
|---|---|
| G-201 · cover gasket | 1 |
Required before the vessel inspection.
Raven checks your worklist against drawings, isolation requirements and spares, so missing items reach the planner before mobilization.

Scope, drawings, isolations and parts are prepared in different places. A job may cite an old drawing, need a blind that is not listed or depend on a gasket with no stock. Those gaps are difficult to see across the whole turnaround.
Raven connects each work order to its drawings, procedures and parts. It drafts the isolations and blind lists, checks spares and permits, and brings unresolved items back against the worklist.
| Required part | Quantity |
|---|---|
| G-201 · cover gasket | 1 |
Required before the vessel inspection.
| Part | On hand | On order |
|---|---|---|
| G-201 | 0 | 0 |
Required: 1 · Available: 0
One G-201 gasket is required. None is in stock or on order, so the planner has a specific shortage to resolve.
Read the CMMS worklist and link the scope to the relevant P&ID revision, procedure and previous job records.
Trace the equipment connections on the drawing. Draft the isolation points, vents, drains and blinds with the procedure references.
Compare the required spares and gaskets with stock and open orders. Check permit drafts against isolations and other work in the same area.
Return the findings by job for the planner and operating team. Re-run the affected checks as scope, drawings and stock change.
Bring drawing, isolation and spares gaps into view while there is still time to prepare.
Start with isolation drafts, blind lists and linked equipment records together.
Reuse the equipment’s linked drawings, parts and previous job records.
Compare isolation requirements and work in the same area.
Check upcoming maintenance parts against the latest stock extract.
Raven is deployed in production across operations, maintenance, HSE, and procurement.
Each finding includes its source records. A fixed fee. Your team confirms the findings.
Use the first findings to agree the wider preparation scope. Raven can prepare the remaining work, or your team can run it in Raven. The operating team reviews and authorizes isolations and permits.