Make your P&IDs smart.
Scanned drawings become clickable, connected P&IDs in weeks. Select a tag to open its datasheets, procedures, history and spares.
Flow control valve
- Service
- Discharge flow control
- Size
- 3"
- Fail action
- Fail closed
What is the fail action of FCV-1102?
Fail closed — per DS-FCV1102 §3DS-FCV1102 · p.3Try it: click P-101A, V-201, FCV-1102, or PSV-201 on the drawing
Turning P&IDs into smart assets.
Read
Extract tags, lines and equipment from the drawing.
Connect
Link each object to its documents and plant records.
Check
Raven’s engineers review; your team confirms on the drawing.
Publish
Open the validated drawing and its connected asset records.
Search across everything, with the source.
Ask by tag, equipment or symptom. Find answers across plant documents and records, with the source attached.
Explore Raven KnowledgeWhat you get
Searchable, clickable P&IDs
Land on the right tag, line, valve, or instrument in the drawing.
One page per asset
Datasheets, SOPs, manuals, history, and spares behind every asset.
Linked equipment records
Parts, material codes, spares, and vendor files, all connected.
Validate and export
Engineers approve; export to Excel, CSV, JSON, or API.
Live in weeks, as an overlay
Validated smart P&IDs in 2–4 weeks, alongside your existing DMS and EAM.
Stays current as the plant changes.
Revised drawings and closed MOCs update the connected records. Your DMS and EAM stay authoritative.
One asset base, reused across the plant.
Running in production, used every day.
"Raven helps us make correct decisions much faster."
Sr. Manager, Ammonia Plant · Indorama
Raven is deployed in production across operations, maintenance, HSE, and procurement.
Read customer story

